BIM²form Manage · Check material availability

Check material availability while you plan

BIM²form, the Add-in for Autodesk® Revit®, compares your formwork plan with the stock you have for every article. A traffic light shows per pour cycle what fits, what gets tight and what runs short, while the plan is still open.

Isometric illustration of material availability check

The problem

Plan, check, plan again.

In most offices the stock check comes last. The plan is finished, the quantities go to the yard or the rental desk, and only then it turns out that material is short.

Checked too late

Availability is known only after the formwork plan is done.

2nd planning round

A shortfall means replanning cycles or switching systems on a finished plan.

Rental on short notice

Missing material gets rented at short notice instead of being planned in.

Planning time with and without availability checkWithout the check, the stock is checked after planning and a shortfall forces a second planning round. With Check Material Availability, the check runs during planning and the plan is finished about 30 percent sooner. Without the check PlanCheckReplan after shortfall With the check Plan, stock checked while you plan ~30 % less planning time

The difference: the stock check moves into planning, the second round is omitted.

How it works

From stock list to buildable plan in three steps.

In BIM²form you find it as Check Material Availability in the Manage group of the ribbon.

Isometric illustration of uploading the inventory list

Link your stock list

Point BIM²form to an Excel file with article number, maximum quantity and description. That can be your own yard stock or the rental capacity you have agreed on.

Isometric illustration of planning formwork

Pick cycles and update

Plan as usual. Whenever you want to know, choose all pour cycles, single cycles or your selection in the model and update. Every planned article appears next to its maximum stock quantity

Isometric illustration of alerts of shortfalls

Read the traffic light, adjust

Red above 95 % of your stock, yellow above 75 %, green below. Filter for red or yellow rows, exclude the scarce element or switch sizes or systems, plan again and update until your stock works with your plan.

Traffic light: planned quantity as a share of your stockAnimated example of the traffic light in BIM²form. Each article shows how much of its maximum stock quantity is planned: green below 75 percent, yellow above 75 percent, red above 95 percent. After adjusting the plan and clicking Update, the red articles turn green. Utilization of your stock, per article above 95 % above 75 % below ARTICLEPLANNED / MAX. STOCK 100 % = your stock Panel 300 × 75 40 % Panel 300 × 45 132 % 58 % Inside corner 84 % Tie rod 99 % 71 % Push-pull prop 30 % Plan adjusted, Update clicked Schematic example. Thresholds as shown in BIM²form (95 % / 75 %), article names illustrative.

In the software

One panel shows where your stock gets tight.

Rental Capacity opens next to your Revit model. Cycles, traffic light, articles and stock list sit in one place.

Pick the cycles

All cycles, single cycles or the walls you selected in the model.

Link the stock list, update

Import an Excel file with your stock or agreed rental capacity. Update runs the check again.

Read the traffic light

Red above 95 % of your stock used, yellow above 75 %, green below.

Compare article by article

Max. stock quantity next to the planned quantity. Filter for red or yellow rows only.

Material Availability Annotated UI

From red to green in one round

Too many panels of one size? Exclude them in the Storage Manager, let BIM²form place the formwork again and click Update. The red rows turn green before anything is ordered.

See it in action

Watch the walkthrough

Link the stock list, choose the cycles, read the colors, adjust the plan. Recorded in Autodesk® Revit® with BIM²form and MEVA Mammut 350.

Business impact

Decide on the material before the plan is done

~ 30% less planning time

Shortfalls no longer trigger a second planning round. The check happens while you plan, not afterwards.

 

Your own stock first

Plan with what is in your yard before you rent additional material.

No surprises at loading

Shortfalls show up in the planning office, not when the truck is being loaded.

Part of BIM²form Manage

One model. From forming to stock check to export.

Check Material Availability works on the same Revit model you plan your formwork with. It sits next to the other evaluation tools: Maximum Quantity and the Custom Quantity Export in BIM²form Manage. No second tool, no export round trip.

Maximum Quantity tells you how much you need at peak.
Check Material Availability tells you whether you have it.

AI illustration showing exported formwork quantities

Form walls and slabs

Wall and Slab commands help you produce the planned model, manually, partially automated or fully automated.

Check against your stock, then export

Compare the need with your inventory list and export the part list to Excel.

Maximum Quantity

Determine the peak quantity your project needs across all pour cycles.

FAQ

Frequently Asked Questions

What does Check Material Availability do?

It compares the quantity you plan for each article with the maximum stock quantity from your Excel list and shows the utilization as a traffic light. You can check all pour cycles, single cycles or just the elements you selected in the model.

Which file format does the stock list need?

An Excel file (.xlsx) with one row per article: article number, maximum quantity and description.

What do the traffic light colors mean?

Red means more than 95 % of your maximum stock quantity is planned, yellow more than 75 %, green less.

Can I check single pour cycles?

Yes. Choose all cycles, single cycles or the elements selected in the model, then click Update.

What happens when an article runs short?

The row turns red. You decide how to react: exclude the scarce element in the Storage Manager, use other panel sizes or another system, form again and click Update.

Does it work with every formwork system?

This command is currently evaluates MEVA components only.

How is it different from Maximum Quantity?

Maximum Quantity tells you the peak quantity your project needs across all pour cycles. Check Material Availability compares that need with what you actually have in stock.

Which BIM²form edition includes it?

Check Material Availability is s available with a BIM²form Manufacturer PRO subscription for MEVA for existing customers with release 26.4.0.