Norway´s Longest Railway Bridge ??
– Challenging Formwork Design with BIM Approach

The recent issue of FormworkPress* features an article about how BIM²form was used for the formwork design of the Minnevika railway bridge that is to be completed in autumn 2023. Our BIM² team also provided support and guidance to our customer MAXBO Teknikk during the formwork design phase.

The project is part of the state-owned company Bane NOR‘s ongoing upgrade of the railway system in Norway.
In order to simplify the collaboration with Teknikk‘s contractor and to enable a streamlined connection to the BIM workflow, a 3D formwork model was used.

Are you curious about the project?

Read the article here:

Deutsch | English | Français | Nederlands | Magyarul | Español

*FormworkPress is a publication of MEVA Formwork Systems.

WordPress Cookie Hinweis von Real Cookie Banner